May 2026
Type: Development milestone + GitHub internal beta · Merged PRs: 101
From Story to a Reviewable PR
PR #6 added repository-aware Story discovery, PR #16 generated refactoring opportunities, and PR #26 introduced requirement-consistency checks. PR #31 planned PR splits and cumulative gates, PR #36 produced a human-readable HTML review artifact, and PR #41 validated AI-authored Spec and PR narratives.
Risk-Adaptive Gates and Independent Review
PR #66 added the Agent Review lifecycle, PR #68 the risk-adaptive Gate DAG, and PR #71 the Decision Record Gate. PR #91 enforced a fresh base before PR creation, while PR #98 moved PR creation behind VibePro.
Design, Publication, and Deployment Checks
The month also added native Design System derivation (PR #77), OSS readiness (PR #87), the Engineering Judgment DAG (PR #110), secret safety (PR #114), Environment Graph evidence (PR #116), and deploy verification (PR #120).
GitHub pre-release v0.1.0-internal-beta.1 was published on May 5. npm publication followed in June.